After this first week of design and selection of a project, the entire team started working together. 3 weeks is a really short period of time to build and do the finishing of a 20square mt building! Things had to go fast and steady.

The entire structure of the building was in wood, most of which was recycled from a big exhibition that took place in the area. We setup a small workshop to prefabricate all the pieces and assemble them into big boxes in order to make the construction as quick as possible.

While some of us were still working on the plans, the rest of the team started laying the foundations. Because of restrictions due to firemen access, we had to move the entire structure a few metres inside the courtyard, not the same anymore but still visible from the road, still powerful!

01-5-IMG_5272

02-6-IMG_5269

[The whole “Rabbit” lies on these 2 beams. They’d rather be straight and horizontal… Double check.]
Avignon, though it is in the south of France, often sees temperatures below zero during the winter. A good insulation is necessary and will also improve the comfort during the hot summers. Which insulating material is local, natural, pest free, resistant, inexpensive and available in abundance??? Rice Husk!! That is what we used to insulate the floor and the roof of the building

03-15-IMG_8431

Time to fill the wallswith straw and earth
The wooden structure of the walls needed to be filled with a material which is aesthetically appealing, insulating but with a good inertia and of course made of a natural and local material. That is when Seb got in and taught us how to prepare the straw and earth mix.

08-13-IMG_8619 09-14-IMG_8616

10-12-IMG_8626

[Step 1 : spread the straw bale in a big pile]

11-10-IMG_8687

[Step 2 : mix the earth with water and spray it on top of the pile ]
Here is a tip
: fix a trowel at the end of your watering can, you will get a wonderful mud fountain!

12-11-IMG_8670

[Step 3 : after closing the wall compartments with a wooden board, fill the mix in and start ramming…  ]

13-09-photo (5)

[Step 4 :  ramming…  ]

14-1-IMG_5379

[Step 5 :  ramming…  ]


16-3-IMG_5394

[The future amphitheater  ]

17-08-photo (8)

20-2-IMG_5435

We had to leave before the roof was laid, 1 week before the opening… not much sleep and lots of learning! We had grown into a wonderful construction team together.

19-3-IMG_5432

18-4-IMG_5426   21-07-photo (14)

23-04-DSCF0362

[Most the doors and windows where recycled from local deconstruction site ]

24-06-photo (15)

[Last details…]

05-01-DSCF0470 26-05-Premier concert le lapin s

[The opening!! First concert in the rabbit … 32 people! ]

27-ob_84eb61_dsc02211[The building is now occupied all week long by an architect who is working on the over-whole rehabilitation of this industrial complex.]

22-03-DSCF0364The rabbit stands tall and proud. It is amazing what 10 people can do if they put all their energy in it!
You can follow the adventure of the “Tri Postal” on their blog : http://tripostal.org/

What is this project all about? Read here
Visit Touraterre website herePhoto credits : Lorraine Bonduelle

Post a comment

“There was an incredible will from the group of architects, and the entire process was very democratic.”
Late nights of design and discussion, lots of cutting, sticking, crunching, debating and starting over again. The entire design process lasted a week begining with a competition between the architects to present a proposal for the cabin. 

09-2-1403-IMG_5000 04-IMG_5004 07-2-5 11-2-24
24-IMG_5198

The design proposals were then presented to a jury comprising of representatives from the city municipality, artists and sculptors, architects who have worked in the city, and the people living in the shelter homes. Based on the Jury’s choices, the group decided together on a project.

12-2-26 15-2-30 16-2-31 20-2-37 21-2-38 22-2-40

The decision process within our group, enriched by the inputs given by the jury was a good example of true collaborative decision taking. Everybody tried to put his / her ego aside to decide which project would serve best the place, the people and the context, build-able in 2 weeks and challenging!

“It is all of us who will live here and construct, we will choose a final project that motivates us to build.”

06-2-3

Jeremie and Felicia’s project was chosen. “I have never seen an earth building like that one before! It will attract attention of the public towards this abandoned site.”

19-2-35

The selected project description:
A Rabbit at the TRI postal of Avignon
1-1-JF-vue pont-zoom copy
The project is a call for attention towards the street; the volume unfolds beyond the old industrial courtyard, by raising its head beyond the fence. Wooden structure filled with earth and straw, the unique form attracts curiosity, it is a transition between the city and the different actors of this big and vivid rehabilitation project. Compact, to minimize its contact with the ground and its consumption of energy, it’s two levels are interconnected through an amphitheater creating a generously spacious interior that allows for multiple uses: a smaller and lighter office area of a more private character at the upper level, and a gathering area for meetings at the lower level, unfolding itself with large openings towards the courtyard of the TRI Postal.
“The rabbit will not only have a life in cardboard and drawings but will actually have a wooden skeleton with an earth and straw filling!

All the buzz at the TRI Postal immediately caught the attention of the local newspapers!

3642589369
1-11-306271004

What happened next? Coming soon.
What is this project all about? Read here.
Visit Touraterre website here
Photo credits : Lorraine Bonduelle

Post a comment

10-1433884951

“It is a different energy to have a challenge and to sweat towards it all together.”

In the month of September 2014, we worked on an exciting project in the South of France, together with 10 architects from across Europe and the association Touraterre.

(Friends from Touraterre started their association with a journey: a travel from Austria to Auroville, India. 12, 000 Km by train and bus, through Turkey, Iran, India, China, Kazakhstan, Russia, Ukraine and Poland.  Their goal was to visit, draw, discover and document construction projects along the road. They also visited institutions where ecological building techniques are being discussed, used and taught. Through Touraterre, they now promote the use of raw earth construction for contemporary architecture. Learn more about their adventures on their website here)

Together with a local organization “H.A.S” that supports homeless people in the main cities of France, their current project is to rehabilitate the TRI, Mail Sorting Centre of the French Postal Services in the city of Avignon. It is a huge industrial building from the 1900s located in the centre of the city, adjacent to the main train station. It has been abandoned for the last 15 years. The rehabilitation project is to convert it into an active social and cultural centre for Avignon, along with renowned French architect, Patrick Bouchain.

1-IMG_8890
[Corridors of the Sorting Centre]

To kick-start the transformation process, Touraterre and H.A.S this year, invited architects to design and build a ‘cabane de chantier‘, a custom designed temporary cabin on site to enable the organization of meetings, gatherings, etc. Architects and students from across Europe joined the team to live together, cook together, eat together, design together and build together, all within a period of one month! At the end of the month, the city of Avignon was invited for a grand inauguration of the new structure and presentation of the overall vision for the site.

The cabin was to be designed to occupy 20 square metres within the compound walls of the sorting centre. Building techniques with raw earth, straw and recycled wood were to be used.

Here are some sketches of the site. An old caravan had found its final resting place inside the compound. Shipping containers, remodeled as temporary shelters were put up inside to house the homeless people; a factor important during both design and construction.
“We are in their home”

2100384771.2

“What we are interested in is not only what earth architecture can be, but what our process is and what it brings to the people.” Here are some images of Life at the TRI during the first week.

04-IMG_4971[Working on the design in the main building of the sorting centre]

06-IMG_4986[Lunches and dinners together in the courtyard]

03-IMG_4961
[Open kitchens]

09-2-9
10-2-10
[Straw from a farm nearby, ready to be used for construction]

12-IMG_5221

What was the design process like? Know more here.

Visit Touraterre website here
Photo credits : Lorraine Bonduelle